New fuel farm infrastructure

  • Project period: 2023-2026
  • Investment: 14,20 Mill. € Technical equipment

New fuel farm infrastructure

  • Hardware and software of the fuel farm control system with safety integrity level 2 (SIL2) with approx. 15,000 data points
  • Motor controls with soft start and frequency converter
  • Control room with 3 workstations, conference/crisis table and 5 m² video wall
  • Electrical installation in hazardous areas of approx. 12,500 m²
  • Outdoor lighting in hazardous areas of approx. 12,500 m²
  • Lightning protection, surge protection and bonding in hazardous areas of approx. 12,500 m²
  • Fire alarm technology in explosion-hazardous areas of approx. 12,500 m²
  • Gas extinguishing technology in the electrical rooms with a total area of approx. 160 m²
  • Gas warning technology in potentially explosive area of approx. 12,500 m²
  • Information and communication technology with active and passive components as well as structured cabling
  • Video surveillance system in explosive areas of approx. 12,500 m².
  • Audio and intercom systems in hazardous areas with 15 intercom-stations and loudspeakers within an area of approx. 12,500 m²
  • Cathodic corrosion protection of the pipeline over a length of approx. 850 m
  • Leakage detection and location system of the pipeline of approx. 850 m length