New fuel farm infrastructure
- Project period: 2023-2026
- Investment: 14,20 Mill. € Technical equipment
New fuel farm infrastructure
- Hardware and software of the fuel farm control system with safety integrity level 2 (SIL2) with approx. 15,000 data points
- Motor controls with soft start and frequency converter
- Control room with 3 workstations, conference/crisis table and 5 m² video wall
- Electrical installation in hazardous areas of approx. 12,500 m²
- Outdoor lighting in hazardous areas of approx. 12,500 m²
- Lightning protection, surge protection and bonding in hazardous areas of approx. 12,500 m²
- Fire alarm technology in explosion-hazardous areas of approx. 12,500 m²
- Gas extinguishing technology in the electrical rooms with a total area of approx. 160 m²
- Gas warning technology in potentially explosive area of approx. 12,500 m²
- Information and communication technology with active and passive components as well as structured cabling
- Video surveillance system in explosive areas of approx. 12,500 m².
- Audio and intercom systems in hazardous areas with 15 intercom-stations and loudspeakers within an area of approx. 12,500 m²
- Cathodic corrosion protection of the pipeline over a length of approx. 850 m
- Leakage detection and location system of the pipeline of approx. 850 m length