Cologne Bonn Airport

Rehabilitation of Taxiway Bravo BA 1-8, RWY 06/24 and new construction of lighting Station XX

  • Project period: 2016 to 2024
  • Investment: approx. 4.50 mill. € Technical equipment

Rehabilitation Taxiway Bravo BA 1-8

  • Taxiway centerline lighting (TXC) Cat II / III
  • Bi-directional LED inset lights for direction-dependent switching via individual lamp control
  • Taxiway edge lighting in underfloor design with LED technology
  • LED-stop-bars across the entire width of the taxiways
  • Alternating power supply from new additional transformer station
  • Installation of runway guard lights (RGL) at the holding position (STB) to runway 06/24 at a distance of 90m to the runway axis RWY 14R/32L
  • New LED signage according to ICAO, Annex 14, EASA
  • New turn pad in the area of threshold 06

RWY 06/24

  • In the course of the renovation of runway 06/24, the existing lighting systems, such as runway centerline, runway edge, threshold and end lighting, as well as the lighting of the touchdown zone for both landing directions LR 06 and LR 24, were also renewed with LED technology.

New construction Transformer / Lighting Station

  • Merging of the existing transformer stations / lighting stations XIII, XIV and XV into a new station
  • New transformer station / lighting station with MV/LV switchgear, transformers 1000 KVA, AGL Power Supply, incl. IT room
  • Construction of network cabinets and new cable connections to the Tower, Station XIII, Station XIV and XV
  • Relocation of all supply cables (FLYCY) for the lighting circuits with adaptation of the infrastructure

Control and Monitoring System

  • Expansion and conversion of the lighting control system (AGL-CMS) during ongoing 24-hour operation with the establishment of a continuous system structure
  • Installation of additional control cabinets in station XX with integration into the existing fiber-optic ring