Berlin Brandenburg Airport
Operation monitoring and control system
- Project period: 2022 to 2025
- Investment: Mill. € Technical equipment
Evaluation of replacement of AGL-CMS with A-SMGCS functionality
- Compatibility with existing control and monitoring hardware
- Supplement / extension / update of the existing specifications with DFS (ANSP) and FBB-Aviation
- Development of the infrastructural requirements (IT) for the AGL-CMS
- Creation of a realization concept
- Creation of a decision matrix
- Implementation of the new solution during continuous operation of the Airfield Ground Lighting system
- Compatibility of the existing hardware in the wards and in the field must be guaranteed with the new top-level control system