Schulze Consulting Engineers for Airports

Berlin Brandenburg Airport

Operation monitoring and control system

  • Project period: 2022 to 2025
  • Investment: Mill. € Technical equipment

Evaluation of replacement of AGL-CMS with A-SMGCS functionality

  • Compatibility with existing control and monitoring hardware
  • Supplement / extension / update of the existing specifications with DFS (ANSP) and FBB-Aviation
  • Development of the infrastructural requirements (IT) for the AGL-CMS
  • Creation of a realization concept
  • Creation of a decision matrix
  • Implementation of the new solution during continuous operation of the Airfield Ground Lighting system
  • Compatibility of the existing hardware in the wards and in the field must be guaranteed with the new top-level control system